PROJECTS
Connecting Buffalo: Precision Underground Construction for ErieNet
Our underground crews have been hard at work across Buffalo and the surrounding region, building out the ErieNet fiber network and delivering high-speed connectivity to our communities.
Trenching & Fiber Installation: Performed open-cut trenching through city streets and sidewalks, placed conduit and handholes, and pulled sub-duct and fiber cable.
Hydro-Vac Excavation: Safely exposed and daylighted existing underground utilities before digging.
Horizontal Directional Drilling (HDD): Completed complex crossings under active railroads and the NYS Thruway with minimal disruption to traffic and surrounding property.
Complete Surface Restoration: Repaired and finished every site once work wrapped up, including concrete, asphalt, topsoil, and seed.
ElCo Projects
Lancaster L531
This job was an energized 34.5kV line with 4.8kV underbuilt distribution. We replaced 32 cross arms, 2 insulators, and 3 structures. We completed this job using hot-stick live-line methods. The job was located along a busy stretch of Cole Rd in the Town of Boston, NY.
Vestal L355
This job involved a double-circuit, energized 34.5kV line. We replaced cross arms on 15 structures, replacing 3 insulators and 4 structures. We completed this job using hot-stick live-line methods. We were also tasked with completing the civil side of the project, which entailed building and repairing existing right-of-way roads and constructing work pads at each structure.
Maryland Storm
We were tasked with fixing 24 double-circuit 34.5 kV and 12kV distribution transmission structures. Crews removed and installed new transmission poles and 29,100ft of conductor in 8 days. We conducted around 24 rolling roadblocks to pull wire and ropes across the interstate.
Distribution Trimming Projects
Crews are working on a 100-mile stretch of distribution line clearing in the Southern Tier
As part of routine 3–5-year cycle maintenance, our crews perform specialized tree trimming and vegetation management along high-voltage distribution lines to protect electrical infrastructure and maintain public safety.
Our Forestry Division is also working a 6-year transmission clearing project for National Grid
GET STARTED
Your inquiry will be personally reviewed and coordinated with the appropriate operations lead or department.